What is a static calculation?#

A static calculation assesses whether a structure can carry and safely transfer the assumed loads. Among other things, it considers the forces at supports and connections, the stresses in components, and deformations. A calculation is only as meaningful as its underlying model, the data entered, and the assumptions made.

In live event technology, static calculations help assess planned structures and their load paths before setup. They do not replace checking the actual setup or an assessment by a suitably qualified person.

What belongs in static calculation documentation?#

Depending on the task, traceable documentation may contain, for example:

  • the purpose and scope of the calculation and a description of the structure;
  • overview drawings, position plans, and construction details;
  • the material, cross-section, and manufacturer data used;
  • assumed loads, supports, boundary conditions, and load combinations;
  • calculation results and the corresponding verifications for members, connections, and supports;
  • connection forces and information needed for adjacent structures;
  • limitations and differences between the calculation model and the planned setup;
  • the responsible people, date, and any required review or approval records.

This is guidance on completeness, not a generally applicable legal format requirement. The documents actually needed depend on the type of structure, location, use, approval process, and applicable technical rules. Clarify them with the responsible design professionals and, where required, the relevant authority.

Which regulations may be relevant?#

Building structures are subject to the building codes and related regulations of the state where the structure is erected. A structure is not a temporary structure (Fliegender Bau) solely because it is used temporarily. Among other things, what matters is whether it is intended and suitable to be repeatedly erected and dismantled at different locations. Whether a particular structure falls under the rules for temporary structures and which approval or notification procedures apply must be clarified for each case under current state law and with the responsible building authority.

For example, Section 76 of the Brandenburg Building Code defines temporary structures and exceptions to the execution permit requirement, including certain stages up to 5 m high, with a floor area of 100 m² and a floor height of 1.50 m. This exception applies to the scenario defined there in Brandenburg; it is not a nationwide rule. Other requirements may also apply.

Within the scope of DGUV Regulation 17, stability and load-bearing capacity must be considered during intended use and during assembly and dismantling. The regulation also addresses load-bearing and rigging equipment. The DGUV explains that Regulations 17 and 18 are specified in more detail by DGUV Rule 115-002. Check the scope and requirements that apply to the operation; these rules do not prescribe one single verification method for every setup.

For temporary structures, the Conference of Building Ministers publishes information on state law and the Model Building Code. Model provisions do not replace the applicable state law. Requirements from trade fairs, venues, and operators may also apply.

Verifiable documentation and external review#

Traceable calculation documentation and an external review are different things. The qualifications, review, approval, or acceptance required depend on the specific construction project and applicable regulations. This overview does not establish who may prepare or review a calculation in every case. Agree on roles and requirements with the responsible professionals and authorities.

Production Assist can support modeling, calculation, and documentation. A calculation performed in the software does not automatically become a reviewed static calculation or official approval. Nor does it guarantee that every component, connection, action, and assembly state required for the project has been included. In particular, check whether the model represents the actual structure and uses the correct material, cross-section, support, and load data.

For a separate external review of an online project, you can use File → Request Verified Structural Calculation... in Production Assist. The order process, its requirements, and the review results shown are described in Request a verified static calculation. An integrated calculation and an external review are separate processes.

What the Production Assist calculation shows#

The calculation scope depends on the model, active load combinations, and enabled verifications. Depending on the inputs and supported objects, results may include support forces, deformations, cross-section utilization, wind, ground, tipping, and sliding assessments, as well as verification notices. Not every result is available for every member or load combination.

Start with the guide Static Calculations. It explains how to prepare structures, loads, and supports, check the calculation scope, and review the results and calculation report. You can also find background on the structural models used in statically determinate and indeterminate systems and Eurocode: strength and serviceability.